Wheeling, explained

For decades there was one place to buy electricity.

This is what changed, and what it now allows you to do. No jargon, and nothing to sign.

What changed

  1. 01

    One supplier.

    Eskom generated the electricity and sold it to you, or sold it to your municipality, which sold it to you. One supplier, one tariff, one bill, and no alternative to compare it against.

  2. 02

    The wires in between.

    Eskom's national transmission network and your municipality's local lines. Poles, cables and substations carrying electricity from wherever it is made to wherever it is used. That network is the grid, and it has never been the thing you were buying.

  3. 03

    Now you can buy elsewhere.

    Thresholds on private power generation began to lift from 2021. Every plant still has to be registered. You can now contract directly with an independent generator or a trader. They supply it, the same grid still delivers it, and you pay the network owner a charge for that delivery. Buying across the grid this way is called wheeling.

The wires did not change. Who you are allowed to buy from did.

Your connection and your site stay exactly as they are. The one thing worth checking is your metering.

There are two kinds of wheeling

Traditional wheeling

For sites supplied at high or medium voltage. A generator injects electricity onto the network at one point and you draw it at another. There is a route from the plant, across the grid, to your site, and the deal is built around that route. The saving arrives as a credit on your bill, and your supply agreement with Eskom or your municipality is amended.

Virtual wheeling

There is still a route: from the generator, into Eskom's grid, to the meter at your premises. It bypasses the municipality, not the grid. The generator must be connected to Eskom's grid. It injects, you draw, and Eskom nets the two volumes and pays a rebate for the wheeled energy. Your existing supply agreements and bills don't change, and sites on municipal supply can take part too. Nothing is rewired. It also works for sites on low voltage. A business with twenty small outlets, each on low voltage, can't use traditional wheeling, but it can use virtual wheeling.

Portfolio wheeling.

Coming soon from Eskom. Talk to us if you want to know more.

Which one fits

We do both, so you don't have to choose before you talk to us. The difference is how the saving reaches you. Traditional wheeling shows it as a credit on your bill and needs a high or medium voltage supply. Virtual wheeling leaves your bill unchanged and pays the saving as a rebate, and works on low voltage too.

What a Power Purchase Agreement actually is

A Power Purchase Agreement sets the rules for years. Under it, every settlement period is a transaction: how much of which generator's metered output goes to which buyer, in which time-of-use band, and what that turns into in money paid and received. The plant may sit on your property, or elsewhere with the existing grid delivering it.

There are three prices inside that deal. The one you are quoted, the one you sign, and the one you actually pay. They are rarely the same number.

  1. 01

    Choosing

    Offers arrive on different terms, volumes and escalation. Side by side they look comparable. They are not, and the cheapest rate is rarely the best deal.

  2. 02

    Signing

    The contract sets how much power, in which hours, at what price, and what happens when the plant falls short. What was promised in the offer does not always survive into it.

  3. 03

    Running

    Every month, for the whole term, someone has to work out what was delivered, what was owed and what is charged. Too often nobody checks it against the contract, and value leaks.

The first two are agreed once. The third happens every month, for the life of the agreement. That is where value is most often lost.

What it truly costs once everything is in

A rate on its own tells you very little. The number that matters is what lands on your account once the network charges, the losses and the municipal charges are counted. Two offers with the same rate per kilowatt hour can land very differently, depending on where the plant sits, when it generates, and what your own consumption looks like hour by hour.

This is why we model your load before anyone quotes you anything.

Why the spreadsheet stops working

A signed wheeling agreement carries penalties, guarantees and time of use rules for the whole of its term. One workbook can hold one deal. At three it stops working.

  • Billing cycles that do not line up.
  • Penalties and guarantees nobody is tracking.
  • Energy never reconciled against the contract.
  • And one person who owns the model, whose logic leaves when they do.

The spreadsheet is not wrong. It is that nobody beyond the person who built it can prove it is right.

Why now

Eskom's tariffs for industrial users have more than doubled in the past decade. Coal is not leaving. Decommissioning has been deferred repeatedly, and the cost of running an ageing fleet, along with the debt behind it, stays in the tariff you pay.

A wholesale electricity market is on the way, and businesses that are already contracted will be best placed to use it.

That's the basics. If you'd like to know which kind of wheeling fits your sites, talk to a person. If you're the one who has to make it work, read on.

Part two

How it actually runs

The rest of this page is the mechanics of virtual wheeling. It is written for the person who will have to make it work.

How virtual wheeling runs: five steps, then a monthly cycle

  1. 01

    Register

    You register as the buyer on Eskom's platform. We handle the specialist support.

  2. 02

    Load the agreements

    We load your agreements and combine your sites' consumption into one profile. Eskom-supplied data comes direct. Municipal sites need check metering, which we arrange.

  3. 03

    Go to market

    We take your load to pre-qualified suppliers through Energypro Marketplace. You sign with the supplier or suppliers you choose.

  4. 04

    Transaction plan

    Each month, energy is allocated across your sites under the rules in your contract, balancing each site's guarantee against the available Eskom rebate.

  5. 05

    Monthly cycle

    Once live, we run the same process every month, and a person on our team checks it.

What happens every month

  1. 01

    Time of use metering data is collected, validated and submitted to Eskom.

  2. 02

    Eskom verifies the data and calculates the rebate.

  3. 03

    The rebate is paid for the registered sites.

  4. 04

    We reconcile that rebate against your agreements, so energy is neither over-allocated nor under-allocated.

Not every site qualifies

It is better to find that out now than three months in.

  • Time of use metering, installed and working. If your site has none, there is nothing to reconcile, and we will tell you what it would take to put right.
  • An approved meter, approved by Eskom for wheeling settlement.
  • An account in good standing with Eskom or your municipality. On municipal supply, the municipality needs to be in good standing too.
  • Consumption we can verify, consistent enough to model.

We screen every site against these before anything is committed.

Both can qualify. They are not the same job.

Eskom sites

The simplest to include. Settlement is direct with Eskom, which keeps reconciliation and billing straightforward and gives the fastest route to a first transaction.

Municipal sites

These can participate provided the meter is approved by Eskom for wheeling settlement and the municipality itself is in good standing.

A mixed portfolio works. You do not need to separate your sites by supply authority.

If you lease your premises

This still works, and it takes longer. Your landlord has to authorise it in writing, and there are legal and metering considerations that come out of the lease itself.

In our experience these authorisations are the longest lead item in the whole process. If a meaningful share of your sites are leased, start there.

Why more sites is easier, not harder

  • Risk is spread, so a disruption at any one site has limited effect.
  • Generation is allocated dynamically each month, so a change in consumption at one site is absorbed rather than escalated.
  • Aggregated demand improves the terms available from suppliers.
  • A problem at one site does not put the wider strategy at risk.

Glossary

COD
Commercial operation date. The point at which a plant starts generating under the agreement.
Credit
Under traditional wheeling, the saving shown as a line on your electricity bill.
Deemed energy
Energy the contract treats as delivered even though it was not, usually because of something outside the generator's control.
Good standing
An account with no arrears with the electricity provider. A condition of participating, and for municipal sites the municipality has to be in good standing with Eskom too.
High, medium and low voltage
The level at which a site is supplied. Traditional wheeling needs high or medium voltage.
Portfolio wheeling
Eskom's planned option for combining many sites under one agreement. Coming soon.
Power Purchase Agreement, or PPA
The contract between a generator or trader and a buyer setting price, volume, term and what happens when either side falls short.
Rebate
The rebate Eskom pays under virtual wheeling for the energy wheeled to your registered sites.
Reconciliation
Checking what was actually delivered and consumed against what the contract required, every month.
Settlement period
The period over which delivered energy is measured, allocated and paid for under the agreement.
Time of use
Tariffs that charge different rates at different hours. Peak, standard and off peak.
Time of use metering
Metering that records consumption in short periods through the day rather than as a single monthly total, so it can be priced by time of use. Required for wheeling.
Traditional wheeling
Wheeling where the saving arrives as a credit on your bill, and your supply agreement with Eskom or your municipality is amended.
Transaction plan
The rules that decide how generated energy is allocated across a portfolio of sites each month.
Use of system charge
What the network owner charges for carrying the electricity to you.
Virtual wheeling
Wheeling through Eskom's grid that bypasses the municipality. The generator injects, you draw, and Eskom nets the two volumes and pays a rebate. Works for sites at any voltage, including low voltage. Your bill doesn't change.
Wheeling
Buying electricity from a generator somewhere else and having the existing grid deliver it to your site.

The money you could save has always been there, sitting inside a bill you were never allowed to question.

See how we run a deal

A person on our team checks twelve months of bills against your meter and tells you what they find. Free for the first 100 South African businesses.

Start my free check

Talk to a person

Fifteen minutes with someone who knows the market.

Tell us what's going on and we'll tell you plainly what we'd do. No pitch.

Your role
Roughly what do you spend on electricity a month?
How many sites?
Do you have rooftop solar?
Are you already working with an energy adviser or supplier?

Rather call now? 087 808 8667